The operation steps and precautions of the rubber hose press press:
During the operation of the rubber hose buckle press, operators should be familiar with the relevant production processes, be able to skillfully operate the buckle press and tools, labor insurance supplies, and wear them well before they can work. Before Hengchuangting the machine, the fasteners should be ensured to be fastened, the running parts and the movement surfaces are free of obstacles, and the safety and protection devices are complete. The combination of mould base and mold should be kept clean and no hard material such as metal chips.
First, what are the operation steps of the hose press?
1. measure the length of the hose sample with a ruler. A caliper is used to measure the data of metal joints and to observe the inner diameter of the sample. The hose and joints that are ready to be needed. The length required for cutting the hose by a pipe cutting machine, and the inner hole of the hose is cleaned.
2. peel off the outer layer of the rubber tube with the stripping machine and insert the hose into the metal joint sleeve. Must peel off the outer rubber hose. Insert the metal joint straight into the rubber tube to the bottom. The length of the rubber tube is the same as that of the hose sample. The rubber tube is machined with a non - taper pipe shrink machine. To be withheld by the provisions of the alignment of hose locator data.
3. to withhold hose, you can use the manual press button or use the pedal press button. Rubber press in place, and then press the opening button. Withhold withhold data measured with caliper completion. The hose to the specified data can be withheld. Withhold after shutdown, power off.
Secondly, what should we pay attention to during the operation of the rubber hose press?
The positioning screw should be tightened before the 1. assembly module. Before Hengchuangting the machine, the lubricating oil should be injected into the slope of the die seat. It is strictly forbidden to use the oil cylinder in super stroke, and if the sloshing occurs when pressure or pressure is unloaded, it is strictly prohibited to process. The jitter of the cylinder piston or the sharp sound of the oil pump should be discharged from the gas.
The 2. pressure regulating valve should be adjusted at the specified pressure and regularly corrected. The equipment operation is prohibited when the hand is placed on the part of burke. The replacement mold should be carried out after the shutdown. The temperature of the working oil is over 45 C, and the machine should be checked out.

PRODUCTS CONTACT  US LINK  
Hose joint series

Address: No. 33 Pioneering Road, Gongyi Private

Science and Technology Pioneering Park, Henan Province

ABOUT US  DEVICE PICTURE
Hose assembly series HONOR WONDERFUL
Transition joint series Contact us: +86-0371-85610111 CASE  CONTACT
Open flanged series Email: chinahxyy@chinahxyy.com
Subway fastener series    

 

Henan hengchuang Precision Manufacturing Co. Copyright 2018 web site technical support